
Reclamation of an eroded reach of Cripple Creek, a Reedy River tributary running beside the Orange Line of the Swamp Rabbit Trail near Hampton Station. Years of stormwater runoff had cut the channel down into steep, failing banks. The corridor was cleared, the channel re-cut with a flood bench to take the velocity out of high water, the banks laid back to a stable slope, then armoured at the toe and planted.
- Owner
- Greenville County
- Location
- Greenville, SC
- Division
- Public Works
- Scope
- Stream Restoration
What changed.

Before 
After The trail-side reach, looking upstream toward the bridge.

Before 
After The upper reach, where runoff had scoured the bank back into the slope.
The work, as built.
The before frames are the channel as we found it. The after frames are the same reach once the bank plantings had taken.

Bring us your next site.
Stream restoration, streambank stabilization, and drainage work delivered around live greenways and public access. Most consultations are scheduled within 48 hours. Call (864) 305-5307.










