What does healthcare construction involve in South Carolina?
Healthcare construction includes building and renovating medical offices, clinics, outpatient facilities and hospitals. Applicable standards and the reviewing authority depend on the facility type. FGI develops the Codes and Guidelines used in hospitals, outpatient facilities, and residential care and support facilities. The Healthcare division takes on medical offices, clinics, outpatient facilities, and hospital renovations.
The FGI Codes establish the minimum requirements that support regulatory compliance and facility safety. 42 states have adopted some edition of the FGI Codes/Guidelines, and FGI tells owners to check with the state department of health to confirm state regulations. Here, the state's own review process comes first. Read the FGI state adoption map for the national picture, then the state rules below.
Who reviews healthcare construction plans in South Carolina?
The South Carolina Department of Public Health (DPH) Division of Health Facilities Construction reviews plans, specifications, and construction for health care facilities which DPH licenses in South Carolina. All reviews are done on an appointment only basis with the owner or owner's representative present. The owner opens that conversation, and the contractor supports it with documentation.
Not every facility lands in that queue. Some health care facility types such as doctors' offices and clinics are not licensed by DPH and thus are not reviewed or inspected by DPH. Those projects still go through local commercial plan review. Greenville County's Building Safety and Code Enforcement says Plan Examiners are available for preliminary reviews, by appointment only. The DPH Health Facilities Construction overview is the place to confirm which path a facility follows. Confirm the applicable codes and facility standards with the reviewing authority before submitting plans.
What is an infection control risk assessment on a hospital renovation?
An infection control risk assessment (ICRA) is the document that sets which precautions a renovation needs while patients and staff stay in the building. ASHE guidance says to use the ICRA precautions matrix to determine precautions needed during construction, and to include construction-related requirements of the ICRA into contract documents. The contractor then prices and schedules those requirements like any other scope.
This is why a hospital renovation is planned differently from an office upfit. Walls, ceilings, barriers, and shutdowns are sequenced around the owner's clinical operations. The ASHE quick guide on infection control risk assessments lays out the matrix. The division is built around infection control, phasing, and the uptime healthcare owners depend on.
How would Bihn deliver a healthcare project?
We offer Design-Build, Design-Bid-Build, Construction Manager at Risk (CMAR), Preconstruction, and Construction Management. A healthcare owner picks the method that fits the design stage and the procurement rules. Under CMAR, Bihn commits to a Guaranteed Maximum Price at a defined design milestone, carries the cost risk, and provides open-book accounting.
Joe Martin, Partner and Chief Preconstruction Officer, owns the preconstruction phase: estimating, scheduling, value engineering, and constructability review. On a healthcare job, that is where infection control barriers, phasing and shutdown windows get priced and scheduled before the work starts. Our preconstruction services page covers that phase, and the commercial division page shows the other sectors we build.
The Upstate health system market
Upstate owners are building. These are owner announcements, not Bihn projects. Prisma Health announced that it is beginning work on a $350 million expansion at Greer Memorial Hospital, and it broke ground on a $138 million inpatient behavioral health hospital in the Upstate. Bon Secours announced a new 12,500 square foot facility with 9 exam rooms including one specifically for trauma care, as part of its Five Forks freestanding emergency department. In Anderson, AnMed Medical Center is a 495-bed acute-care hospital.
For a general contractor, that activity means owners and architects already know the review path. They will ask how a contractor handles infection control, phasing, and documentation. The answers belong in the first meeting.
Send drawings, an RFP or an invitation to bid
Mike Reda, Partner and Chief Growth Officer, is the first call for new project inquiries. We accept invitations to bid, RFQs, RFPs, and drawings at welcome@bihnconstruction.com or (864) 305-5307. You can also use the project inquiry form.
We return documentation for an owner's prequalification file, and the capabilities page lists what is available. Headquarters are at 122 Clair Dr, Piedmont, SC 29673.


