The Project
A new surface parking lot for Greenville Senior High School, built on the corridor between the road and the Edward P. Holder, Jr. Track and Field. The site is hemmed in by an active rail line on one side and the track on the other, so the lot had to be cut, drained, and paved inside a narrow working envelope.
- Owner
- Greenville Senior High School
- Location
- Greenville, SC
- Division
- Public Works
- Scope
- Site & Paving
Scope of Work
Site clearing, grading, and subgrade preparation
Storm drainage and inlet structures
Concrete curb, gutter, and landscape islands
Asphalt paving and access drives
Erosion control along the adjacent rail corridor
On Site
The work, as built.
Photographed after paving, before striping and final island landscaping.

Built to Outlast Us.