Skip to content
Bihn Construction
Construction Manager at Risk by Bihn Construction in Upstate South Carolina
Shared risk, open books

Early partner, Guaranteed Maximum Price, and open-book accounting.

What This Is

Shared risk, open books

BIHN is engaged early in your project as a collaborative partner, providing preconstruction cost input, scheduling, and constructability review before the design is final. At a defined milestone, we commit to a Guaranteed Maximum Price (GMP), taking the cost risk onto our books. Open-book accounting, full transparency, and one team accountable for both schedule and budget.

How We Deliver Construction Manager at Risk

The way we actually run it.

The Method
/ 03

Every project moves through the same disciplined sequence. Nothing is improvised, and nothing is left to chance.

  1. 01

    Guaranteed Maximum Price

    We lock cost at a defined milestone and carry the overrun risk.

  2. 02

    Early Contractor Involvement

    Field expertise shapes the design before it's final, reducing changes and surprises.

  3. 03

    Open-Book Accounting

    Full cost transparency throughout the project.

How We Build

Built with purpose: precision + partnership.

A disciplined four-phase process keeps every project aligned, from first site visit to final walkthrough. And our commitment does not stop there.

01Phase

Predesign

Homesite Evaluation & Feasibility
Architect + Designer Introduction
Preliminary Budget Guidance
Regulatory Review & Approval Strategy
Vision Alignment & Project Scope
02Phase

Preconstruction

Master Schedule Development
Detailed Cost Estimate + Allowances
Value Engineering + Constructability Review
Finish Selection Guidance
Permit Management + Long-Lead Procurement
Contract Finalization & Kickoff
03Phase

Construction

Onsite Supervision + Subcontractor Coordination
Schedule Control + Progress Updates
Transparent Cost Tracking + Invoicing
Quality Assurance + Inspections
Finish Detail Execution
Client Walkthroughs + Ongoing Communication
04Phase

Post-Construction

Final Punch List + Turnover
Maintenance Recommendations
Continued Support for Future Projects
Built, Not Promised

Selected work.

Full Portfolio
Steel-Frame Commercial Build · Commercial, Greenville, SC
Commercial

Steel-Frame Commercial Build

Greenville, SC
Lakeside Modern Residence · Custom Residential, Upstate Lake Country, SC
Custom Residential

Lakeside Modern Residence

Upstate Lake Country, SC
Spillway & Water-Control Structure · Public Works, Upstate, SC
Public Works

Spillway & Water-Control Structure

Upstate, SC
Questions

Construction Manager at Risk, answered.

Early partner, Guaranteed Maximum Price, and open-book accounting. Bihn Construction runs construction manager at risk with disciplined planning, transparent budgets, and a single point of accountability from first conversation to final walkthrough.

Yes. Bihn Construction is a licensed South Carolina general contractor, bonded and fully insured on every project, with a single point of accountability from preconstruction through closeout.

Budgets are locked early and tracked openly, subcontractors are prequalified, and the schedule is maintained and reported, so there are no surprises at the end.

Greenville and the wider Upstate of South Carolina, from our office in Mauldin.

Built to Outlast Us.

Start your construction manager at risk project.

Early partner, Guaranteed Maximum Price, and open-book accounting. Tell us about your project, timeline, and budget. We'll bring one point of accountability from first sketch through final walkthrough. Most consultations are scheduled within 48 hours.