
Early partner, Guaranteed Maximum Price, and open-book accounting.
Shared risk, open books
BIHN is engaged early in your project as a collaborative partner, providing preconstruction cost input, scheduling, and constructability review before the design is final. At a defined milestone, we commit to a Guaranteed Maximum Price (GMP), taking the cost risk onto our books. Open-book accounting, full transparency, and one team accountable for both schedule and budget.
The way we actually run it.
Every project moves through the same disciplined sequence. Nothing is improvised, and nothing is left to chance.
- 01
Guaranteed Maximum Price
We lock cost at a defined milestone and carry the overrun risk.
- 02
Early Contractor Involvement
Field expertise shapes the design before it's final, reducing changes and surprises.
- 03
Open-Book Accounting
Full cost transparency throughout the project.
Built with purpose: precision + partnership.
A disciplined four-phase process keeps every project aligned, from first site visit to final walkthrough. And our commitment does not stop there.
Predesign
Preconstruction
Construction
Post-Construction
Selected work.

Steel-Frame Commercial Build
Greenville, SC
Lakeside Modern Residence
Upstate Lake Country, SC
Spillway & Water-Control Structure
Upstate, SCConstruction Manager at Risk, answered.
Early partner, Guaranteed Maximum Price, and open-book accounting. Bihn Construction runs construction manager at risk with disciplined planning, transparent budgets, and a single point of accountability from first conversation to final walkthrough.
Yes. Bihn Construction is a licensed South Carolina general contractor, bonded and fully insured on every project, with a single point of accountability from preconstruction through closeout.
Budgets are locked early and tracked openly, subcontractors are prequalified, and the schedule is maintained and reported, so there are no surprises at the end.
Greenville and the wider Upstate of South Carolina, from our office in Mauldin.

Start your construction manager at risk project.
Early partner, Guaranteed Maximum Price, and open-book accounting. Tell us about your project, timeline, and budget. We'll bring one point of accountability from first sketch through final walkthrough. Most consultations are scheduled within 48 hours.
